Connemara Drive | Finished Basement

Project Details

Connemara Drive – Finished Basement

Cost: $80,000

Project Overview:
Loyal 9 Development undertook the construction of a 500 sq. ft. finished basement at a residential property, aimed at providing additional living space and a bathroom for the homeowners’ grandchildren. The project encompasses the installation of an egress window system, electrical, plumbing, and HVAC systems, along with flooring, painting, drywall, and an acoustical ceiling.
 
Key Features:
  • Egress Window System: Installed to provide a safe emergency exit option.
  • Electrical, Plumbing, and HVAC: Comprehensive systems designed to ensure comfort and functionality.
  • Interior Finishes: Includes flooring, painting, drywall, and acoustical ceiling for a seamless living space.
 
Execution:
The project unfolds with meticulous attention to detail across multiple phases. Loyal 9’s expertise in residential construction ensures adherence to safety standards and client specifications. This addition not only enhances the property but also caters to the homeowners’ specific needs, showcasing Loyal 9’s capability in delivering tailored residential solutions.